Monday, January 26, 2009

The Sun is about to rise as construction cranes loom around Launch Pad 39-B at Kennedy Space Center, Florida.

TAKING SHAPE... Just thought I’d share these two cool photos of work being completed on the second of three towers that will provide lightning protection for NASA’s Ares I launch vehicle, which will hopefully become operational by 2015. The third and final tower, which along with the other two will be 600 feet in height once finished, should be completed by March or April...well before the scheduled test flight of the Ares I-X rocket in July. In terms of Ares I-X itself, expect a blog in the near future with photos of the vehicle as it continues to be assembled at Kennedy Space Center (KSC) in Florida.

The Sun is about to rise as construction cranes loom around Launch Pad 39-B at Kennedy Space Center, Florida.

A boilerplate mock-up of the Orion spacecraft that will be attached to the top of Ares I-X is scheduled to arrive at KSC via cargo plane this Wednesday or Thursday. Nice.

An artist's concept of an ARES I rocket launching into the sky.

All images courtesy of NASA

Saturday, January 24, 2009

The crew of STS-119 pose in front of space shuttle Discovery at Launch Pad 39-A at Kennedy Space Center, Florida, on January 20, 2009.
NASA / Kim Shiflett

TWO WEEKS FROM TODAY, I’ll hopefully be heading back to Florida to see in person space shuttle Discovery (above), and changes that are being made to a nearby launch pad (below) to prepare it for NASA’s next generation launch vehicle, the Ares rocket. Can’t wait...

Construction nears completion on the second of three new lightning towers at Launch Pad 39-B at Kennedy Space Center, Florida, on January 22, 2009.
NASA / Kim Shiflett

Wednesday, January 21, 2009

President Obama and his wife Michelle look on from within the reviewing stand as NASA displays its Lunar Electric Rover, during last night's Inaugural Parade in Washington, D.C.
NASA / Bill Ingalls

2009 INAUGURAL PARADE... Thanks to Ronsmytheiii of NASASpaceflight.com, here are a couple of screenshots from yesterday’s parade showing NASA’s contingent in the ceremony. Along with the Moon buggy above (officially called the Lunar Electric Rover), the space shuttle Endeavour crew who flew on last Fall's STS-126 mission also got to march down Pennsylvania Avenue.

President Obama and his wife Michelle look on from within the reviewing stand as the space shuttle astronauts of flight STS-126 march down Pennsylvania Avenue.
NASA / Bill Ingalls

The 7-member crew of space shuttle flight STS-126 wave to the crowd during last night's Inaugural Parade in Washington, D.C.
NASA / Paul Alers

Unfortunately, all the major U.S. TV networks cut away from their parade coverage well before NASA had its turn in the spotlight at the presidential reviewing stand (where Obama and his wife were viewing the parade from)...but it’s clearly obvious that the organizers were wise in saving the rover’s appearance for last. It probably would've stole the show (you see one marching band, you’ve seen them all).

Screenshots of NASA's Lunar Electric Rover at the Inaugural Parade, on January 20, 2009.
Screenshots of NASA's Lunar Electric Rover at the Inaugural Parade, on January 20, 2009.

CollectSPACE posted up this video on the NASASpaceflight webpage, courtesy of CNN.com.

Wednesday, January 14, 2009

Space shuttle Discovery arrives at Launch Pad 39-A at Kennedy Space Center, Florida, on January 14, 2009.
NASA / Troy Cryder

A MILESTONE AT THE PAD... At 9:16 AM, Pacific Time today, space shuttle Discovery arrived at its seaside launch pad in Kennedy Space Center, Florida. The shuttle will now undergo final preparations as it gears up for liftoff on February 12. On a personal note, this is a significant event for me...since, as stated in this previous entry, I will hopefully be there in person to view Discovery on the pad before it rockets its way to the International Space Station a few weeks from now. NASA did its job in providing me the opportunity to view a shuttle live before its heads off into space; now it’s up to me to take advantage of the moment. Can’t wait till February 7!

Thursday, January 8, 2009

GEARING UP FOR FEBRUARY... Yesterday afternoon, the space shuttle Discovery was rolled over to the Vehicle Assembly Building at Kennedy Space Center in Florida. Over the next week or so, Discovery will be mated to its external fuel tank and twin solid rocket boosters in preparation for its launch (on mission STS-119) to the International Space Station on February 12.

Space shuttle Discovery is transported from its hangar to the Vehicle Assembly Building at Kennedy Space Center, Florida, on January 7, 2009.  Preparations continue for its February 12 launch to the International Space Station, on flight STS-119.
NASA / Jim Grossmann

This time around, what makes preparations for NASA’s first space shuttle flight of 2009 significant to me is that I’ll hopefully be in Florida from February 7-10. Ya’ll are probably asking, why not just stay an extra two days to see Discovery actually lift off in person? I’ll elaborate on that in future journal entries (but the main reason why I’m not gonna stay in Florida longer is because of money. Staying at a place for 4 days and not 6 or even 7 days obviously makes a huge difference, spending-wise. And I don’t exactly have a high-paying job right now, haha).

One of three lighning towers stand completed as construction continues at Launch Complex 39-B.  39-B is undergoing modifications as it will become the launch site for the Ares I rocket, which will replace the space shuttle in 2015.
NASA / Kim Shiflett

Once mated with its fuel tank and boosters, Discovery will roll over to its launch pad, 39-A, on January 14. Speaking of the other pad, 39-B, construction continues to take place on the three huge lightning towers that will protect the Ares I rocket (shown below... Ares I will launch from 39-B) once it (hopefully) becomes operational around 2015. As you can see from the pic above, one of the towers have already been completed. Yet another thing to look forward to seeing in person exactly a month from now.


An artist's concept of an Ares I rocket at Launch Complex 39-B.
NASA

Wednesday, December 24, 2008

An artist's concept of the Dragon spacecraft in Earth orbit.
SpaceX

ENTER THE DRAGON... Yesterday, NASA offered two private aerospace companies—Orbital Sciences Corp. and SpaceX—a contract worth $3.5 billion to haul cargo and/or crew to the International Space Station (ISS) after the space shuttle retires in 2010. The reason why this interests me is pretty much implied above: the United States has the potential to have two types of manned vehicles that will take astronauts into space by 2015. Besides the Dragon capsule that's shown in the pic above, the other manned vehicle—of course—is NASA’s Orion spacecraft.

An artist's concept of the Falcon 9 rocket lifting off from Cape Canaveral in Florida.
SpaceX

2009 should be an intriguing year for U.S. human spaceflight. The Dragon spacecraft and the Falcon 9 rocket (which is also constructed by SpaceX) that will carry Dragon into space will undergo a series of test launches next year. This July will see the launch of Ares I-X, a prototype of the Ares I rocket that will ferry the Orion spacecraft to the ISS, and hopefully to more distant destinations (ahem, the Moon, Near Earth Asteroids and of course, Mars?) starting in the later half of next decade. The launch of Ares I-X, however, depends on whether or not the shuttle Atlantis will be able to get off the ground next May on a mission to service and repair the Hubble Space Telescope one last time.

Various segments making up the upper stage simulator on the Ares I-X rocket are being mated together at Kennedy Space Center in Florida.
NASA / Troy Cryder

One more thing: Our nation’s potential to have two manned space vehicles by 2015 also hinges on what Barack Obama does when he officially becomes the U.S. President on January 20. *Crosses fingers.*

An arrtist's concept showing the Ares I-X rocket on its launch pad at Kennedy Space Center in Florida.
NASA

Saturday, November 15, 2008

The full moon shines bright high above space shuttle Endeavour as it prepares to launch towards the International Space Station on November 14, 2008.
NASA / Kim Shiflett

ENDEAVOUR LAUNCHES... Just thought I’d share these two cool photos of the full moon shining high above the space shuttle as it launched on flight STS-126 yesterday evening. Endeavour’s mission involves the installation of several important furnishings (including new sleeping quarters and a high-tech recycling system that converts astronauts’ sweat and urine—you heard right—into clean drinking water) onto the International Space Station to enhance its capability to hold a 6-person crew starting next May or June. Only 3 astronauts/cosmonauts have lived onboard the orbiting outpost since it permanently became habitable 8 years ago this month.

Endeavour is scheduled to return to Kennedy Space Center in Florida on November 29.

The full moon provides a backdrop as space shuttle Endeavour soars into the night sky on flight STS-126 on November 14, 2008.
NASA / Troy Cryder

Wednesday, October 1, 2008

50 YEARS AGO TODAY, America's space program officially began operations. Awesome.

NASA's 50th Anniversary Logo.

Saturday, September 20, 2008

Space shuttle Atlantis stands ready for launch at Kennedy Space Center's Pad 39A in the foreground, while in the background, at Pad 39B 1.6 miles away, Endeavour begins preps for a potential rescue mission to Atlantis if she is found damaged during next month's flight to the Hubble Space Telescope.
NASA / Troy Cryder

TWO BIRDS, READY FOR FLIGHT... At 3:59 AM, Pacific Time yesterday, space shuttle Endeavour arrived at Kennedy Space Center's Launch Pad 39B to begin preps for a potential rescue mission (STS-400) if Atlantis is found damaged during her flight to the Hubble Space Telescope. Atlantis herself has been at Pad 39A since September 4, and is still on track for an October 9 launch to HST.

Space shuttle Atlantis stands ready for launch at Kennedy Space Center's Pad 39A in the foreground, while in the background, at Pad 39B 1.6 miles away, Endeavour begins preps for a potential rescue mission to Atlantis if she is found damaged during next month's flight to the Hubble Space Telescope.
NASA / Troy Cryder

If Atlantis is found to be unscathed during STS-125, Endeavour will be rolled over to Pad 39A, and begin preparations for her next official flight, STS-126. 39B will then officially be handed over to NASA’s Constellation program, and will be the site of next year’s launch of the Ares I-X rocket. Ares, in case you didn’t know, is the vehicle that will hopefully launch American astronauts back to the Moon by 2020. Hopefully.

Space shuttle Atlantis stands ready for launch at Kennedy Space Center's Pad 39A in the foreground, while in the background, at Pad 39B 1.6 miles away, Endeavour begins preps for a potential rescue mission to Atlantis if she is found damaged during next month's flight to the Hubble Space Telescope.
FLORIDA TODAY / Michael R. Brown

Sunday, September 7, 2008

BACK AT THE PAD... After several days of delays due to the approaching risk of Tropical Storm Hanna, space shuttle Atlantis finally rolled out to its Florida launch pad last Thursday. At first, I thought that NASA was being overly optimistic making this move...seeing as how there were two storms, Hurricane Ike and Tropical Depression Josephine, still brewing out there in the Atlantic. Judging from this page as of today, Josephine is gone, and Ike was only (but perilously) going to pass near the tip of southern Florida on its way to the Gulf of Mexico.

Atlantis is scheduled to launch from Kennedy Space Center at 9:33 PM on October 9 (California time), on a mission to repair the Hubble Space Telescope one last time. Hubble should last for 5 more years beyond 2008 if the repairs go smoothly on STS-125.

Space shuttle Atlantis arrives at Launch Complex 39A in Kennedy Space Center, Florida, on September 4, 2008.  Preparations will continue to get it ready for its October 9 launch to the Hubble Space Telescope, on flight STS-125.
NASA / Kim Shiflett